This gallery marks the start of the Smith-Richardson project.
The tear-off consisted of three layers of roofing. A gravel roof,
a smooth roof, and modified roof that was only 6 years old.
The gypsum deck underneath those layers of roof was very
deteriorated. Large sections of the deck are replaced.
After the repairs are effected, an underlayment of felt is
hot mopped onto the deck. This layer doubles as vapor retarder
for the final roof system, as well as a temporary roof for the
evening.
Other albums in this gallery:
File: 10_Tear_Off_6.jpg
Filename: 10_Tear_Off_6.jpg
File: 11_Tear_Off_7.jpg
Filename: 11_Tear_Off_7.jpg
File: 12_Tear_Off_8.jpg
Filename: 12_Tear_Off_8.jpg
File: 13_Tear_Off_9.jpg
Filename: 13_Tear_Off_9.jpg
File: 15_Tear_Off.jpg
Filename: 15_Tear_Off.jpg
File: 1_Tear_Off_01.jpg
Filename: 1_Tear_Off_01.jpg
File: 3_Tear_Off_02.jpg
Filename: 3_Tear_Off_02.jpg
File: 3_Tear_Off_2.jpg
Filename: 3_Tear_Off_2.jpg
File: 5_Tear_Off_3.jpg
Filename: 5_Tear_Off_3.jpg
File: 8_Tear_Off_5.jpg
Filename: 8_Tear_Off_5.jpg
File: Gyp_Repairs.jpg
Filename: Gyp_Repairs.jpg
File: Gyp_Repairs_1.jpg
Filename: Gyp_Repairs_1.jpg
File: Gyp_Repairs_2.jpg
Filename: Gyp_Repairs_2.jpg
File: Gyp_Repairs_3.jpg
Filename: Gyp_Repairs_3.jpg
File: Gyp_Repairs_4.jpg
Filename: Gyp_Repairs_4.jpg
File: Temporary_Roof-1.jpg
Filename: Temporary_Roof-1.jpg
File: Temporary_Roof_2.jpg
Filename: Temporary_Roof_2.jpg
File: Temporary_Roof_3.jpg
Filename: Temporary_Roof_3.jpg
File: Temporary_Roof_4.jpg
Filename: Temporary_Roof_4.jpg
File: Temporary_Roof_5.jpg
Filename: Temporary_Roof_5.jpg